Land Surface Roughness and Its Impact on Wind Energy Potential in the Arid Terrains of Western Iraq

Authors

DOI:

https://doi.org/10.46717/igj.2026.59.1F.5

Keywords:

Wind energy; Land surface; Surface roughness; Arid terrains; Iraq

Abstract

Surface roughness is a critical parameter in wind resource assessment, which determines the vertical wind speed profile and has a significant impact on the intensity of turbulence and extrapolation of energy yield estimates. Unlike in the preceding studies that have overlooked the terrain roughness aspect in the estimation of the wind resources in Iraq, this study provides a rigorous and systematic evaluation that directly incorporates surface roughness parameters in the determination of the site suitability as well as the prediction of potential wind farm energy output. A key feature of this approach is the use of the Wind Atlas Analysis and Application Program WAsP methodology integrated with the Global Wind Atlas dataset. The impact of surface roughness on wind characteristics and energy production from wind turbines was analyzed at three sites in Anbar Province, namely Al-Nukhayb, Al-Qa'im, and Al-Haqlaniyah, western Iraq. Wind shear, mean wind speed, power density, the Weibull parameters, and the sensitivity of these parameters to surface roughness variations were evaluated. The results indicate that changes in surface roughness led to changes in mean wind speed, Weibull scale parameter, and shear coefficient, which showed a logarithmic increase with respect to surface roughness. It observed that the prevailing wind direction originates maunly from the northwest, and the study succeeded in determining the various capacity factors for wind turbines according to different surface roughness. The capacity factors reached 30.5% at the first site, 19.2% at the second and 31.7% at the third. This highlights the substantial influence of surface roughness on evaluating the suitability of wind turbines sites. The results provide useful insights for accurately assessing wind resources and efficiently installing turbines in the initial planning stage.

 

Downloads

Published

2026-06-30