Data-Driven Selection of the Most Cost-Effective Turbine for Basrah Governorate Using Advanced Software Tools

Authors

  • Ali K. Resen Scientific Research Commission, Research and Technology Center of Environment, Water and Renewable Energy, Baghdad, Iraq
  • Angham A. Mahmood The General Directorate of Education, Second Rusafa, Ministry of Education
  • Ihsan S. Abd Scientific Research Commission, Research and Technology Center of Environment, Water and Renewable Energy, Baghdad, Iraq

DOI:

https://doi.org/10.46717/igj.2025.58.1D.12

Keywords:

Renewable energy; Wind energy; WAsP; Windographer; Basrah

Abstract

Determining the optimal location for wind turbine installation is crucial in developing wind energy projects. This study employs a data-driven methodology to examine wind energy potential, patterns, and distribution accurately. Advanced analytical software, such as WAsP and Windographer, was employed to illustrate wind distributions and calculate Weibull parameters, in addition to seasonal and monthly wind patterns. A simulation was performed to assess various wind turbines and identify the most suitable turbine for the research region. The results indicated that the average wind speed was 5.74 m/s, and the power density was 190 watts/m² at a height of 50 m. The summer months of June, July, and August demonstrated the highest wind velocities compared to the other months of the year. The Vestas V100 wind turbine demonstrates the highest capacity factor of 27.3%, owing to its large rotor diameter, which facilitates superior wind capture, thereby augmenting power output and energy generation capability. This study provides a conclusive viewpoint for those seeking to promote wind energy projects in Basrah Governorate, together with decision-makers and stakeholders.

Downloads

Published

2025-04-30